DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

C Cable Ductwork

 

 

 

 

 

 

 

 

Page C-5

 

 

 

 

 

 

 

Table C-2. Installation Sequence

 

 

 

 

 

 

 

 

 

Step

Group

Remarks

 

 

 

 

 

 

 

 

1

41

Install basic ductwork on each cabinet

 

 

 

 

 

 

 

 

2

51

Install cross-aisle shielded ductwork

 

 

 

 

 

 

 

3

10 or 26

Install I/O cross-aisle or cabinet to wall cable trough

 

 

 

 

 

 

 

 

22-25

Install I/O cross-aisle to wall trough duct

 

 

 

 

 

 

 

4

8

Install I/O cable rack coupling to rear of cabinet

 

 

or

or

 

 

 

 

9

install I/O cable rack riser to end of cabinet

 

 

 

 

 

 

 

 

5

12-19,

Install AC power ducts

 

 

 

 

21, 32,

 

 

 

 

 

34, & 35

 

 

 

 

 

 

 

 

6

27

Install shielded cable ducts between DEFINITY and

 

 

 

DIMENSION cabinets

 

 

 

 

 

 

 

 

7

28

Install I/O cable ducts between DEFINITY and

 

 

 

 

 

DIMENSION cabinets

 

 

 

 

 

 

 

8

29 & 31

Install shielded duct assembly from front of system

 

 

 

cabinet to rear of a DEFINITY cabinet (group 29) or

 

 

 

front of a DEFINITY cabinet to rear of system cabinet

 

 

 

(group 31)

 

 

 

 

 

 

 

9

30

I/O transition assembly for cross-aisle (DEFINITY)

 

 

 

 

 

10

33

Ladder rack supported 86 or 88.5 inches (218.4 cm

 

 

 

or 224.8 cm) from floor

 

 

 

 

 

 

 

 

 

 

Continued on next page

Page 352
Image 352
Lucent Technologies Release 6 manual Table C-2. Installation Sequence Step Group Remarks