DEFINITY Enterprise Communications Server Release 6 | Issue 5 | ||||
Installation and Test for | May 1998 | ||||
C Cable Ductwork |
|
|
|
| |
|
|
|
| Page | |
|
|
|
|
|
|
| Table |
|
| ||
|
|
|
|
|
|
| Step | Group | Remarks |
|
|
|
|
|
|
|
|
1 | 41 | Install basic ductwork on each cabinet |
|
| |
|
|
|
|
|
|
2 | 51 | Install |
|
| |
|
|
|
|
| |
3 | 10 or 26 | Install I/O | |||
|
|
|
|
|
|
|
| Install I/O |
|
| |
|
|
|
|
| |
4 | 8 | Install I/O cable rack coupling to rear of cabinet | |||
|
| or | or |
|
|
|
| 9 | install I/O cable rack riser to end of cabinet |
|
|
|
|
|
|
|
|
5 | Install AC power ducts |
|
| ||
|
| 21, 32, |
|
|
|
|
| 34, & 35 |
|
|
|
|
|
|
|
| |
6 | 27 | Install shielded cable ducts between DEFINITY and | |||
|
|
| DIMENSION cabinets |
|
|
|
|
|
|
|
|
7 | 28 | Install I/O cable ducts between DEFINITY and |
|
| |
|
|
| DIMENSION cabinets |
|
|
|
|
|
|
| |
8 | 29 & 31 | Install shielded duct assembly from front of system | |||
|
|
| cabinet to rear of a DEFINITY cabinet (group 29) or | ||
|
|
| front of a DEFINITY cabinet to rear of system cabinet | ||
|
|
| (group 31) |
|
|
|
|
|
|
| |
9 | 30 | I/O transition assembly for | |||
|
|
|
|
| |
10 | 33 | Ladder rack supported 86 or 88.5 inches (218.4 cm | |||
|
|
| or 224.8 cm) from floor |
|
|
|
|
|
|
| |
|
|
| Continued on next page | ||