Lucent Technologies Release 8.2 manual Switch 2 Task Assign IP Route to Switch, Ip n

Models: Release 8.2

1 524
Download 524 pages 28.9 Kb
Page 108
Image 108

Configuration 2: R7r (+CMS) <—ethernet—> R7csi

3 C-LAN Administration

Switch 2 Task — Assign IP Route (to Switch 1)

This task specifies a route for packets sent by the node 5 IP interface (the ethernet port on the switch-2 C-LAN board) to the nodes 1 and 2. An IP route is required because node 5 is on a different subnetwork from nodes 1&2 (as defined in the Subnet Mask field on the IP Interfaces screen), and the Gateway Address field for node 5 on the IP Interfaces screen was left blank.

The Destination Node will be set to “net-96”, which is associated with the network IP address of 192.168.1.96 on the Node Names screen. This will enable node 5 to communicate with any node on the 192.168.1.96 subnetwork.

Steps

Begin

 

 

 

 

 

 

> Open the IP Routing form — enter

a ip n

 

 

 

 

 

 

 

 

 

add ip-route next

 

Page 1 of

1

 

 

 

 

 

IP ROUTING

 

 

Route Number: 2

 

 

 

 

Destination Node: net-96

___

 

 

 

 

Gateway: node-4

 

 

 

 

 

 

 

 

 

 

 

C-LAN Board: 1c05

 

 

 

 

 

Metric: 0

 

 

 

 

 

 

 

 

 

[The system assigns the route number 2.]

 

> Enter values

 

 

 

 

 

 

 

 

 

 

 

 

Field

 

Conditions/Comments

 

 

 

 

 

 

Destination

 

The name of the node at the destination of this route. In this case,

 

Node:

 

net-96 is associated with IP address 192.168.1.96 on the Node

 

 

 

Names screen. This is the network IP address of the subnet that

 

 

 

nodes 1 and 2 are on. See the description of the Subnet Mask field

 

 

 

in Switch 1 Task — Assign IP Interfaces (page 77) .

 

 

 

 

 

 

Gateway:

 

Node name of the IP-route gateway by which the destination node

 

 

 

is reached for this route. In this case, it is the node name of the

 

 

 

router port.

 

 

 

 

 

 

 

 

C-LAN

 

The location of the C-LAN circuit pack that provides the interface

 

Board:

 

for this route.

 

 

 

 

 

 

 

 

 

 

 

Metric:

 

Enter 0.

 

 

 

 

 

 

See IP Routing (page 251) in Appendix A for more information

 

 

 

on the use of the Metric field.

 

 

 

 

 

 

 

 

 

> Submit the screen

End

 

 

Administration for Network Connectivity

88

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 108
Image 108
Lucent Technologies Release 8.2 manual Switch 2 Task Assign IP Route to Switch, Ip n