Configuration 5B: R8csi <—ppp—> R8r (2 C-LANs)

3 C-LAN Administration

<—ethernet—> R8si

 

Configuration 5B: R8csi <—ppp—> R8r (2 C-LANs) <—ethernet—> R8si

In this configuration, a DEFINITY ECS R8r acts as a gateway between two other nodes — one connected via ppp to an R8csi and the other via ethernet to another R8si. This configuration is the same as configuration 5A except that Switch 1 has two C-LAN circuit packs instead of one. One C-LAN handles the ppp connection and the other handles the ethernet connection.

Switch 2

Switch 1

DS1

C-LAN(a)

node-1a

DEFINITY ppp ECS R8r

DEFINITY ECS

R8csi

node-2

pppDS1

node-1a-ppp

C-LAN

node-1b

Ethernet

Switch 3

Hub

C-LAN(b)

node-1b-eth

C-LAN

node-3

DEFINITY ECS

R8si

Task Summary

The following tasks need to be completed for Switch 1, Switch 2, and Switch 3:

1Review checklist

2Switch 1 administration

a Assign node names

b Assign link to (via a data module) to node-2 c Assign link to (via a data module) to the LAN

d Assign link (via a data module) from C-LAN(a) to C-LAN(b) e Assign link (via a data module) from C-LAN(b) to C-LAN(a) f Assign processor channels

g Assign IP Route: C-LAN(a) to node-3

h Assign IP Route: C-LAN(b) to node-2

3Switch 2 administration

a Enable bus bridge connectivity b Assign node names

c Assign link (via a data module) to node-1a-ppp d Assign processor channels

e Assign IP Route to node-3

Administration for Network Connectivity

 

 

555-233-504 — Issue 1 — April 2000

CID: 77730

171

Page 191
Image 191
Lucent Technologies Release 8.2 manual Definity ppp ECS R8r, PppDS1