Overview

3 C-LAN Administration

Checklist Item

3Remove old circuit packs:

~Turn off the power.

~For the csi model, remove the Processor (TN798) circuit pack (Don’t remove the processor circuit pack if it is a TN798B).

~For the si model, remove the Processor (TN790), PACCON (TN778), and NETCON (TN777) circuit packs. If there are X.25 connections that the customer wants to keep, leave the PI (TN765) circuit pack in the switch; otherwise remove it.

~For the r model, if there are X.25 connections that the customer wants to keep, leave the PGATE (TN755) circuit pack in the switch; otherwise, remove it.

4Install new circuit packs on all switches upgrading from a pre-R7 software load to R8:

~For csi models: install the TN798B (processor) and TN799B (C-LAN) circuit packs.

~For si models: install the TN790B (processor), TN794 (NetPkt), and TN799B (C-LAN) circuit packs. For any PPN or EPN that will be carrying packet data, replace the TN776 (Expansion Interface) with the TN570B or TN570C circuit pack.

~For r models: install TN799B (C-LAN.)

The C-LAN circuit pack is required for TCP/IP (ppp and ethernet) connections. In all cases, the R8 software will run without the TN799B (C-LAN) circuit pack; all other new circuit packs are required for R8.

5Install the R8.1 Software on all switches upgrading to R8.1

6Copy translations from translations flash card or tape (G3r). Use the “working” flash card if step 3 was performed.

NEW and UPGRADE Systems — the following items apply to both new systems and systems being upgraded to R8 from a previous release. For more information about the checklist item, refer to the appropriate installation book in "References", page 56.

7Established physical connections at each node.

8Set software version on the System Parameters Customer Options form.

General Administration for new installations — the following translations should already be in place for existing systems and usually should not need to be changed for an upgrade to R8 unless new nodes are being added to the network. Refer to appendix A for more information about these tasks.

9DS1 circuit packs administered

2 of 3

Administration for Network Connectivity

 

 

555-233-504 — Issue 1 — April 2000

CID: 77730

55

Page 75
Image 75
Lucent Technologies Release 8.2 manual Overview LAN Administration Checklist Item