Configuration 1: R8r <—ppp—> R8si

3 C-LAN Administration

Switch 2 Task — Assign Processor Channels

This task associates data links (hardware) with processor channels (software) on

Switch 2.

Steps

Begin

> Open the Processor Channel Assignment form — enter ch com p

change communications-interface processor-channels

Page 1 of X

PROCESSOR CHANNEL ASSIGNMENT

Proc

 

 

 

Gtwy

 

Interface

Destination

Session

Mach

Chan Enable

Appl.

To Mode

Link/Chan

Node

Port

Local/Remote

ID

1:

n

_______

_

__

_____

__________

0____

___

___

__

2:

n

_______

_

__

_____

__________

0____

___

___

__

:

 

 

 

 

 

 

 

 

 

 

 

21:

y

dcs ___

c

3_

0____

node-1____

5003

21_

12_

1_

:

 

 

 

 

 

 

 

 

 

 

 

64:

n

_______

_

__

_____

__________

0____

___

___

__

> Enter values

Field

Conditions/Comments

Processor Channel 21: (ppp connection to Switch 1)

Enable

Set to y.

 

 

Appl.

Set to dcs for DCS signaling.

 

 

Mode

Node-2 is the “client” for this session. Set node-1 to “server”

 

(s).

 

 

Interface Link

This must match the link number on the node-2 data module

 

screen in the previous task.

 

 

Interface Chan

A value of 0 allows any available interface channel to be used

 

for this connection. The Destination Port number on the

 

Switch-1 Processor Channel screen must also be set to 0.

 

 

Destination Node

Name of the far-end node for this channel. This must be a

 

name entered on the Node Names screen. For ppp

 

connections, it must match the Destination Node Name

 

entered on the ppp Data Module screen.

 

 

Destination Port

This number must match the Interface Channel number

 

assigned on the Switch-1 Processor Channel screen.

 

 

 

1 of 2

 

 

Administration for Network Connectivity

70

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 90
Image 90
Lucent Technologies Release 8.2 manual Switch 2 Task Assign Processor Channels