Configuration 4: R8csi <—ISDN—> R8si Gateway

3 C-LAN Administration

<—ppp—> R8csi

 

 

 

 

 

 

 

 

Field

 

Conditions/Comments

 

 

 

 

 

 

Dest. Digits

 

Extension number of the ISDN interface for TSC #2on the

 

 

 

Switch-1 DS1 circuit pack.

 

 

 

 

 

 

Appl.

 

TSC #2 carries DCS signaling between Switch 2 and Switch 1.

 

 

 

As specified on the Switch-1 NCA TSC Assignment screen,

 

 

 

TSC #2 is administered as a gateway on Switch 1, where the

 

 

 

ISDN signals are converted to TCP/IP.

 

 

 

 

 

 

Mach ID

 

Destination is node 3.

 

 

 

 

 

 

 

 

 

 

2 of 2

 

 

 

 

 

 

> Submit the screen

 

 

 

End

 

 

 

 

 

 

 

 

 

Administration for Network Connectivity

138

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 158
Image 158
Lucent Technologies Release 8.2 manual 138 CID