Switch-Node 2 Administration

 

 

 

4 Networking Example

Processor Channel Assignments

 

 

 

 

Release 6 Processor

 

 

 

 

 

 

 

Channel Assignment

 

 

 

 

 

 

 

screen

 

 

 

 

 

 

 

 

change communications-interface processor-channels

 

 

Page 1 of 4

 

 

 

PROCESSOR CHANNEL ASSIGNMENT

 

 

 

Proc

 

 

Interface

Remote

 

 

Chan

Appl.

 

Link Chan

Priority Proc Chan

 

Machine-ID

1:

______

_

__

____

__

 

__

:

 

 

 

 

 

 

 

 

11:

dcs___

2

11

____

11

 

1

12:

dcs___

2

12

____

12

 

3_

13:

dcs___

2

13

____

13

 

4_

:

 

 

 

 

 

 

 

 

59:

audix_

2

2_

____

__

 

__

 

 

 

 

 

 

 

 

Release 6 Interface

 

 

 

 

 

 

 

Links screen

 

 

 

 

 

 

 

change

communications-interface links

 

 

 

Page 1 of 1

 

 

 

 

INTERFACE LINKS

 

 

 

 

 

Est

PI

 

Destination

DTE/

 

Link

Enable

Conn

Ext

Port

Digits

Brd

DCE

Identification

1:

_

_

_____

____

__________

_____

___

_______________

2:

y

y

2992_

1a1004

1992 _____

_____

dce

_______________

3:

_

_

_____

____

__________

_____

___

_______________

Link 1

[eia] - Connected to : ___ Clocking : ________

 

 

 

 

 

 

 

 

 

 

 

 

 

Administration for Network Connectivity

226

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 246
Image 246
Lucent Technologies Release 8.2 manual Release 6 Processor Channel Assignment Screen, Release 6 Interface Links screen