Configuration 1: R8r <—ppp—> R8si

3 C-LAN Administration

Prerequisite Administration

There are some system administration tasks that need to be completed before you can proceed with the connectivity administration described in this section.

Review the checklist of prerequisite administration tasks in Checklist for Prerequisite Administration (page 54), before proceeding with the connectivity administration in this section.

Configuration 1

 

SWITCH 1

 

 

SWITCH 2

DEFINITY ECS R7r

 

 

DEFINITY ECS R7si

Processor

Interface

software-defined connections

Interface

Processor

 

 

channels

channels

 

 

channels

channels

 

1

 

 

1

 

 

1

1

 

2

 

 

5000

 

 

5000

2

 

 

 

 

5001

 

 

5001

 

 

12

 

 

 

 

 

 

21

 

 

 

 

5003

 

 

x(any)

 

 

384

 

 

64500

 

 

64500

256

 

 

 

 

Link 1

 

 

Link 3

 

Processor

 

 

 

hardware connections

 

Processor

 

 

 

 

 

 

UN331B

 

 

 

 

 

 

TN790B

 

 

Processor bus

 

 

Processor bus

 

 

Network

DS1

Voice data

DS1

 

PktInt

 

 

 

NetPkt

 

control

 

TN767/

 

 

TN767/

TN1655

 

ppp data

TN794

UN332B

TN464

TN464

 

 

 

 

 

 

TDM bus

 

1

 

 

TDM bus

 

 

 

 

 

 

2

 

 

 

 

 

 

1

2

 

 

 

 

 

 

C-LAN

node-1

node-2

C-LAN

 

 

 

 

 

TN799

Ext 2010

Ext 3020

TN799

 

 

 

 

 

 

loc 1b0115

loc 1a1206

 

 

 

 

 

 

 

192.168.10.31

192.168.10.32

 

 

 

Packet bus

 

 

cydfec1a EWS 052099

Packet bus

 

 

 

 

 

 

 

 

Administration for Network Connectivity

555-233-504 — Issue 1 — April 2000

CID: 77730

61

Page 81
Image 81
Lucent Technologies Release 8.2 manual Prerequisite Administration, Configuration, Software-defined connections