Configuration 5B: R8csi <—ppp—> R8r (2 C-LANs)

3 C-LAN Administration

<—ethernet—> R8si

 

4Switch 3 administration

a Assign node names

b Assign link (via a data module) to the LAN c Assign processor channels

5Enable links and processor channels

Prerequisite Administration

There are some system administration tasks that need to be completed before you can proceed with the connectivity administration described in this section.

Review the checklist of prerequisite administration tasks in the Checklist for Prerequisite Administration (page 54), before proceeding with the connectivity administration in this section.

 

 

Administration for Network Connectivity

172

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 192
Image 192
Lucent Technologies Release 8.2 manual 172 CID