Configuration 1: R8r <—ppp—> R8si

3 C-LAN Administration

Switch 1 Task — Assign Link via ppp Data Module to Switch 2

This task administers a ppp data module on Switch 1 for the ppp connection to Switch

2.The data module defines a network interface — it associates a link number with a port address and node name for the C-LAN port on Switch 1. It also specifies the node name for the destination node, which is a C-LAN port on Switch 2.

Steps

Begin

> Open Data Module form — enter ad da n

add data-module next

 

 

 

 

Page 1 of x

 

DATA MODULE

Data Extension:

2010

 

 

Name: _ppp on link 1 to node-2___ BCC: 2

Type:

ppp

 

 

COS: 1

Port:

01b0115

 

 

COR: 1

Link:

1_

 

 

TN: 1

Enable Link?

n

 

 

 

Node Name:

node-1

_____

 

Subnet Mask:

255.255.255.0

 

Establish Connection: y

 

 

 

DESTINATION

 

 

 

 

Digits:

6113020________

Node Name:

node-2_________

CHAP?

n

 

 

 

[The system assigns the extension 2010 to this data module. Instead of n (next) in the command line, you could specify any unused extension in the dial plan.]

> Enter values

 

Field

Conditions/Comments

 

 

 

 

 

 

Type:

This indicates the data-module type for this connection (ppp).

 

 

 

 

 

Port:

In this example, the C-LAN circuit pack is in slot 01b01; the ppp

 

 

connection is through port 15.

 

 

 

 

 

 

Link:

For G3r, the link number must be in the range 1 – 33, not

 

 

 

previously assigned on this switch.

 

 

 

 

 

 

Enable Link?

If you need to add an IP route that uses this node as a gateway,

 

 

 

this field must be set to y before adding the IP route. Otherwise

 

 

 

leave this field set to n until the link administration is complete;

 

 

that is, until after all data modules and the processor channels are

 

 

assigned, then set to y.

 

 

 

 

 

 

Name:

Information-only; appears in list generated by the "list data

 

 

 

module" command.

 

 

 

 

 

 

1 of 2

 

 

 

 

 

 

 

 

Administration for Network Connectivity

 

 

555-233-504 — Issue 1 — April 2000

CID: 77730

63

Page 83
Image 83
Lucent Technologies Release 8.2 manual Switch 1 Task Assign Link via ppp Data Module to Switch