Configuration 4: R8csi <—ISDN—> R8si Gateway

3 C-LAN Administration

<—ppp—> R8csi

 

Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi

In this configuration, a DEFINITY ECS R8r provides gateway conversion between

ISDN and TCP/IP.

Switch 2

Switch 1

DS1

DEFINITY

ECS R8si

DS1

ISDN

node-1

ppp

DEFINITY ECS R8csi

DS1

Switch 3

C-LAN

node-3

DS1

C-LAN

DEFINITY ECS

R8csi

Task Summary

The following tasks need to be completed for Switch 1, Switch 2, and Switch 3:

1Review checklist

2Switch 1 administration

a Assign node names

b Assign signaling group and administered NCA TSC c Assign ISDN-TSC Gateway Channel

d Assign link (via a data module) to node 3 e Assign processor channels

3Switch 2 administration

a Assign signaling group and administered NCA TSC

4Switch 3 administration

a Enable bus bridge connectivity b Assign node names

c Assign link (via a data module) to node 1 d Assign processor channels

5Enable links and processor channels

 

 

Administration for Network Connectivity

124

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 144
Image 144
Lucent Technologies Release 8.2 manual ECS R8si, Ppp Definity ECS R8csi