Configuration 4: R8csi <—ISDN—> R8si Gateway

3 C-LAN Administration

<—ppp—> R8csi

 

 

 

 

 

 

 

Field

Conditions/Comments

 

 

 

 

 

Dest. Digits

Extension number of the ISDN interface on the Switch-2 DS1

 

 

circuit pack.

 

 

 

 

 

Appl.

Specifies that TSC #2 will carry signaling that will be converted in

 

 

Switch-1 to another protocol (TCP/IP), which will then be

 

 

forwarded to Switch-3.

 

 

 

 

 

 

Mach ID

Leave blank for gateway

 

 

 

 

 

 

 

 

2 of 2

 

 

 

 

 

> Submit the screen

 

 

End

 

 

 

 

 

 

 

 

Administration for Network Connectivity

134

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 154
Image 154
Lucent Technologies Release 8.2 manual 134 CID