Configuration 1: R8r <—ppp—> R8si

3 C-LAN Administration

Switch 2 Task — Assign Link via ppp Data Module to Switch 1

This task administers a ppp data module on Switch 2 for the ppp connection to Switch

1.The data module defines a network interface — it associates a link number with a port address and node name for the C-LAN port on Switch 2. It also specifies the node name for the destination node, which is a C-LAN port on Switch 1.

Steps

Begin

>Open Data Module form — enter ad da n

add data-module next

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 1 of x

 

 

 

 

 

 

 

 

 

 

DATA MODULE

 

 

Data Extension: 3020

 

 

 

 

Name: _ppp on link 3 to node-1___ BCC: 2

 

Type: ppp

 

 

 

 

COS: 1

 

 

 

 

 

 

 

 

 

 

 

 

 

Port: 01a1206

 

 

 

 

COR: 1

 

 

Link: 3_

 

 

 

 

TN: 1

 

 

Enable Link? n

 

 

 

 

 

 

 

 

 

 

Node Name: node-2_

____

 

 

 

 

 

 

 

 

 

 

 

 

Subnet Mask: 255.255.255.0

 

 

 

 

Establish Connection: n

 

 

 

 

 

 

 

DESTINATION

 

 

 

 

 

 

 

 

 

 

Digits:

 

 

__________

 

 

 

Node Name: node-1_________

 

 

CHAP? n

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[This data module is assigned the next available extension, 3020.]

>Enter values

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Field

 

 

 

Conditions/Comments

 

 

 

 

 

 

 

 

 

 

 

 

Type:

 

 

 

This indicates the data-module type for this link.

 

 

 

 

 

 

 

 

 

 

 

Port:

 

 

 

In this example, the C-LAN circuit pack is in slot 01a12; the ppp

 

 

 

 

 

 

 

 

 

connection is through port 06.

 

 

 

 

 

 

 

 

 

 

 

 

Link:

 

 

 

The link number must be in the range 1 – 25, not previously

 

 

 

 

 

 

 

 

 

assigned on this switch.

 

 

 

 

 

 

 

 

 

 

Enable Link?

 

If you need to add an IP route that uses this node as a gateway,

 

 

 

 

 

 

 

 

 

this field must be set to y before adding the IP route. Otherwise

 

 

 

 

 

 

 

 

 

leave this field set to n until the link administration is complete;

 

 

 

 

 

 

 

 

 

that is, until after all data modules and the processor channels

 

 

 

 

 

 

 

 

 

are assigned, then set to y.

 

 

 

 

 

 

 

 

 

 

 

 

Name:

 

 

 

Information-only; appears in list generated by the “list data

 

 

 

 

 

 

 

 

 

module” command.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 of 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Administration for Network Connectivity

68

 

 

 

 

 

 

 

 

CID: 77730

555-233-504 — Issue 1 — April 2000

Page 88
Image 88
Lucent Technologies Release 8.2 manual Switch 2 Task Assign Link via ppp Data Module to Switch