Basic Operating Procedure

Section 1-6

1-6-1 Examples

1. Installation

Connect the Power Supply Unit, Coordinator Module, Motion Control Mod- ules, and End Module to assemble the FQM1.

AC100 -240V INPUT

L1

L2/N

NC

NC

Make sure that the total power consumption of the Modules is less than the maximum capacity of the Power Supply Unit.

Use DIN Track to mount the FQM1 to the control panel.

PA202

POWER

L1

AC100 -240V

INPUT

L2/N

NC

NC

FLEXIBLERDY

MOTIONRUN

CONTROLLER ERR

PRPHL ON

COMM1

COMM2

PERIPHERAL 1

PORT

CM001

2

OFF

1

 

 

2

 

CN1

 

RS422

 

 

 

MMP21

 

RDY

A1

 

RUN

B1

 

ERR

A2

IN

 

OUT

B2

00

11

22

33

44

5

5

 

 

6

6

1

2

77

10

11

26

25

 

CN2

 

CN1

2.Wiring

3.Initial Hardware Settings

Note

39

40

2

1

39

40

A

 

B

B

 

A

A

 

B

Connect the power supply, ground, and I/O wiring.

Set the DIP switch on the Coordinator Module. In particular, be sure that the settings for the peripheral port are correct.

Example: When connecting the CX-Programmer to the peripheral port, turn OFF pin 2.

When devices other than the CX-Programmer are connected to the peripheral port and RS-232C port, turn ON pin 2.

 

 

 

CM001

FLEXIBLE

RDY

 

 

MOTION

RUN

 

 

CONTROLLER

ERR

 

 

 

 

 

 

PRPHL

ON

12 OFF

 

COMM1

 

COMM2

 

 

15

Page 38
Image 38
Omron FQM1-MMP21, FQM1-CM001, FQM1-MMA21 operation manual Examples, Installation, Wiring Initial Hardware Settings