Main
Record of Revisions and Updates
Copyright 2005-2006 McDATA Corporation. All rights reserved.
Revision Date Description
Contents
Chapter 1 Introduction
Chapter 2 Hardware Configurations
Chapter 3 Network Design Criteria
Chapter 4 Building a Custom Edge 3000 Chassis
Chapter 5 Configuring an E_Port Extension over an Ethernet WAN
Chapter 6 Configuring an F_Port Extension over an Ethernet WAN
Chapter 7 Configuring an E_Port Extension over an ATM WAN
Chapter 8 Configuring FICON Extension
Chapter 9 Configuring Tape Device Extension
Chapter 10 FC/SCSI Tape Pipelining
Chapter 11 Product Support and Software Maintenance
Chapter 12 Hardware Maintenance
Chapter 13 Troubleshooting and Diagnostics
Appendix A Site Preparation
Appendix B Installation and Cabling
Appendix C Cables, Connectors, and Adapters
Appendix D Advanced UCM Configurations
Appendix E Modifying Static Routes
Appendix F Configure SNMP
Appendix G Resetting the System to Factory Defaults
Page
Page
Figures
Page
Tabl es
Page
Preface
Page
Page
Page
Page
Page
Regulatory and Safety Statements
Laser Compliance Statement
Federal Communications Commission (FCC) Statement
Canadian EMC Statements
United States and Canada UL Certification
International Safety Conformity Declaration (CB Scheme)
European Union Conformity Declarations and Directives (CE Mark)
European Union EMC and Safety Declaration (N-Mark)
Argentina UL Certification
Australia and New Zealand C-Tick Mark
Chinese National Standards Statement
Peoples Republic of China CCC Mark
German GS Mark
NOM
Japanese VCCI Statement
Mexican NOM Mark
Korean MIC Mark
Russian GOST Certification
South African SABS Certification
European Union Waste Managment Information
Danger and Attention Statements
Page
Environmental Considerations for Installation of McDATA Equipment
Page
ESD Precautions
Introduction
Introducing the UltraNet Edge 3000
Page
UltraNet Edge 3000 Benefits
UltraNet Edge 3000 Features
Page
Page
UltraNet Edge 3000 Security
Page
Hardware Configurations
UltraNet Edge 3000 Featurization
Page
Page
Page
Typical Configuration of the UltraNet Edge 3000
Ethernet
ATM WAN
FC/SCSI Tape Pipelining
Valid Hardware Interface Configurations
Fibre Channel Card Dependencies
FC/SCSI E_port
FC/SCSI F_port
FC/SCSI N_port
FICON Port Configurations
Internal Fibre Channel Switch (FCSW)
Hardware Components
Page
Indicators, Switches, and Interfaces
Page
Network Design Criteria
Network Design
Ethernet Network Criteria
Page
Page
Page
ATM Network Criteria
Page
Page
Network Routing Options
Dedicated
Load Balancing
Fail Over
Switch WWN Proxy
E_Port Disk Streaming Network Recommendations
Required Minimum Hardware for E_Port Disk Streaming
E_Port Disk Streaming Compatibility Matrix
Fibre Channel Frame Level CRC
Frame Level CRC on the FCBB Card
Frame Level CRC on the FCXL2 Card
Fibre Channel End to End CRC
Minimum Requirements for CRC
Fibre Channel MTU Batching
Building a Custom Edge 3000 Chassis
Building the Custom Chassis
Starting UltraNet
Using the Custom Chassis Wizard
Page
Page
Page
Page
Page
Page
Page
Configuring an E_Port Extension over an Ethernet WAN
Configuring a 1x1 Ethernet Wide Area Network
Page
Page
Page
Adding a Fibre Channel Interface
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Creating a Data Path
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Configuring an F_Port Extension over an Ethernet WAN
Configuring a 2x2 Ethernet Wide Area Network
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Creating Data Paths for Fibre Channel Switch Interfaces
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Configuring an E_Port Extension over an ATM WAN
Configuring a 1x1 ATM Wide Area Network
Page
Starting UltraNet
Adding Nodes for an ATM WAN
Page
Page
Page
Page
Page
Page
Page
Adding an ATM Circuit
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Creating a Data Path
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Configuring FICON Extension
Configuring a 1x1 Ethernet Wide Area Network
Page
Page
Page
Adding a Fibre Channel Interface
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Creating a FICON Data Path
Page
Page
Page
Using the FICON Global Settings Wizard
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Configuring Tape Device Extension
Setup Prior to Edge Configuration
Network Configuration Examples
Example of Uni-directional Configuration - No Zoning
Configuring Tape Device Extension
Example of Bi-directional Configuration with
Figure 9-2 Bi-directional FC/SCSI Tape Pipelining - with Zoning
Table 9-1 Fibre Channel Switch Zoning Definitions for Figure 8-2
Fibre Channel Switch Zone Device
Zone 2 Edge 10, Tape B2, Media Changer 1
Example of Bi-directional Configuration - Zoning and Optional LUN Mapping
Required Fibre Channel Switch
Required Static Edge LUN Mapping
Page
Required Source WWN Filtering
Configuring Tape Device Extension
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Static Mapping the LUNs and Filtering the Source WWN
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
FC/SCSI Tape Pipelining
Buffering, Emulation, and Data Protection
Buffering and Emulation
Device Error Recovery
UltraNet Edge 3000 Emulation
Protecting the Data
UltraNet Edge 3000 Specific
Fibre Channel
Tape Only
LUN Mapping
Dynamic Target LUN Discovery and LUN Mapping
Overview
Target Discovery
LUN Discovery
LUN Refresh
Dynamic LUN Mapping
Static LUN Mapping
Managing the WWN to Edge Target LUNs
Product Support and Software Maintenance
SNMP Support
Upgrading the UltraNet Edge 3000 Software
Verify your Current Software Version
Upgrading the UltraNet Edge 3000 - On-Site Local
Page
Page
Page
Upgrading the UltraNet Edge 3000 - Remote Dial-up
Page
Page
Page
Upgrading Edge Software from 3.1.1.1 or Higher
UltraNet WebView Monitoring Application
Page
Page
UltraNet ConfigManager Upgrade
Verify the Current Version of UltraNet
Page
Page
Hardware Maintenance
Front and Rear View of UltraNet Edge 3000 Chassis
Replacing the UltraNet Edge 3000 Chassis
Fan Assembly Removal Procedure
Fan Assembly Installation Procedure
Power Supply Removal Procedure
Page
Power Supply Installation Procedure
Top Cover Removal Procedure
Top Cover Installation Procedure
Fibre Channel Interface Card Removal Procedure
Fibre Channel Interface Card Installation Procedure
10/100 Ethernet Interface Card Removal Procedure
10/100 Ethernet Interface Card Installation Procedure
Gigabit Ethernet Interface Card Removal Procedure
Gigabit Ethernet Interface Card Installation Procedure
OC-3 ATM Interface Card Removal Procedure
OC-3 ATM Interface Card Installation Procedure
Replacing the Gigabit Ethernet Short Wave Transce iver
Removing the Gig-E Short Wave SFP
Page
Page
Replacing the Gigabit Ethernet Long Wave Transceiver
Removing the Gig-E Long Wave SFP
Installing the Gig-E Long Wave SFP
Replacing the Gigabit Ethernet Copper Transceiver
Removing the Gig-E Copper Transceiver
Installing the Gig-E Copper Transceiver
Replacing the OC-3 ATM Short Wave Transceiver
Removing the OC-3 ATM Short Wave SFP
Installing the OC-3 ATM Short Wave SFP
Replacing the OC-3 ATM Long Wave Transceiver
Removing the OC-3 ATM Long Wave SFP
Installing the OC-3 ATM Long Wave SFP
Replacing the Fibre Channel Short Wave Transceiver
Removing the Fibre Channel Short Wave
Installing the Fibre Channel Short Wave
Page
Replacing the Fibre Channel Long Wave Transceiver
Removing the Fibre Channel Long Wave
Page
Page
Troubleshooting and Diagnostics
Basic Troubleshooting for the UltraNet Edge 3000
User Interface Commands for the UltraNet Edge 3000
Display the User Interface Commands
IP
TANKIO
ARP
AMDENET 10/100 WAN or Maintenance
Page
GNIC3 Gigabit Ethernet WAN
gnic3 stats
Page
FCCNT
Page
FCSW
FCXL2
Page
CHARM
SUPPORT
LED Diagnostic Codes
Troubleshooting FC/SCSI Tape Pipelining (Device Extension)
Basic Troubleshooting Steps for FC/SCSI Tape Pipelining
Page
Diagnostics
Serial Interface Connection
Ethernet Maintenance Interface Connection
Loading and Starting the
Exit and Reboot
UltraNet Edge 3000 Diagnostic Programs
CHARM Diagnostic Program (ACHT)
Page
PowerPC Diagnostic Program (SBTT)
Fibre Channel Diagnostic Program (FCBB)
Page
Ethernet Diagnostic Program (E10T)
Gigabit Ethernet Diagnostic Program (GBIT)
Page
ZPCM Compression Diagnostic Program (ZPCT)
Page
Flash Drive Diagnostic Program (ISBT)
Graceful Shutdown
A
Site Preparation
Site Requirements
UltraNet Edge 3000 Chassis Dimensions
Clearance Requirements
Environmental Specifications
Power Requiremen ts
B
Installation and Cabling
Overview
Unpacking and Inspecting the Hardware
UltraNet Edge 3000 Placement
Table -Top
Rack Mount
Page
Connecting the UltraNet Edge 3000
Setup Connection
Power Connection
Network Interface Connections
Fibre Channel
Page
Ethernet 10/100
Gigabit Ethernet
OC-3 ATM Cabling and Transceivers
Initial Power-On Procedure
Page
Maintenance and Diagnostics Connections
Serial Interface Cabling Instructions
Page
Cables and Equipment
McDATA-Supplied Cables and Equipment
The cables, adapters, and other equipment listed in Tabl e B-3 are supplied by McDATA.
Customer-Supplied Cables and Equipment
Preventing Damage from Electrostatic Discharge (ESD)
Page
C
DB Adapters Available through McDATA
AA Adapter Pinouts
EE Adapter Pinouts
Tabl e C-5 provides the full names of the pinout initials.
Fibre Channel Specifications
Page
Ethernet 10/100 Specifications
Gigabit Ethernet Specifications
Page
OC-3 ATM Specifications
Page
Page
D
Advanced UCM Configurations
Configuring the Internal McDATA Fibre Channel Switch Interface
FCSW Tab (2 port only)
FC Switch Tab
Page
Page
Time Synchronization Protocol
Configure the Time Synchronization Protocol
Page
Transport CRC Checking
Enable Transport CRC Checking for All Data
E_Port Disk Streaming Settings
Enable/Disable E_Port Disk Streaming
F_Port Disk Streaming Settings
Enable/Disable F_Port Disk Streaming
Page
Page
E
Verify Static Routes
Page
Modify Static Routes
Add Static Routes
Delete Static Routes
F
Page
Page
Page
Page
Adding an SNMP Trap Destination
Deleting an SNMP Destination
Sending Test Trap
Page
Page
G
Page
6. At the prom level, type sysclean.
Page
H
Manual Configuration of the Initial IP Settings
Manually Configure the Maintenance IP Port using the Command Line Interface
Page
Update UltraNet ConfigManager with the Manual Configurations
Page
Page
Page
I
Using the Spantree Portfast Command for Cisco Routers
Issuing the Spantree Portfast Command
Page
J
Configuration Worksheets
Page
Page
Page
Page
Page
Glossary
Page
Page
Page
Page
Page
Page
Page
Index
A
B
C
D
F
G
H
I
J
L
P
R
S
T
U
V
W
Z