Initial Power-On Procedure

5.Turn the power switch(es) to the On () position (this activates the systems initial loading routine). The power switch is located directly above the power cord, see Figure B-4.

Verify status with the indicator lights and the Alphanumeric messages window display on front of the unit. (See the “Indicators, Switches, and Interfaces” section in Chapter 2 for descriptions of the indicators and alphanumeric displays or the “LED Diagnostic Codes” section in Chapter 13, Troubleshooting and Diagnostics).

I

Sb035

Figure B-4Power Supply Switch

After power up, the diagnostic display will toggle between VXOK and BOTP. The UltraNet Edge 3000 is then ready for the UltraNet ConfigManager configuration.

Sb108

Figure B-5Diagnostic Display

B-11

Page 357
Image 357
McDATA 3000 manual Figure B-4Power Supply Switch