B

Installation and Cabling

This appendix provides installation and cabling information for the

UltraNet Edge 3000.

Overview

The UltraNet Edge 3000 host and network I/O hardware components have been pre-installed. You are responsible for the following:

Review the site-preparation requirements in Appendix A, Site Preparation before installing the UltraNet Edge 3000 hardware.

Decide on unit placement.

Unpack and inspect the UltraNet Edge 3000 unit.

Take an inventory of UltraNet Edge 3000 components.

Ensure that ESD procedures are followed, see “Cables and Equipment” on page -14.

If the UltraNet Edge 3000 is placed in a rack mount, attach mounting brackets to the front corners of the unit.

Mount UltraNet Edge 3000 on the equipment rack (or place in tabletop position).

Acquire and attach the appropriate cable types and lengths.

NOTE: After hardware installation is complete, use the UltraNet ConfigManager configuration application to perform your network configurations.