McDATA 3000 Gathering the IP, Addresses, Configuration process. The worksheet is referred to as

Models: 3000

1 428
Download 428 pages 38.05 Kb
Page 217
Image 217

Configuring Tape Device Extension

4. Setting the Initial Configuration

5. Setting the License Information

6. Adding an IP Circuit

7. Creating a Data Path for Fibre Channel Device Extension Interfaces

a. Optional Step: Static Mapping the LUNs and Filtering the Source WWN

 

 

8. Delivering the Configured Network

 

 

 

 

 

 

 

 

NOTE: Fibre Channel Switch Zoning, Static Edge LUN Mapping, and Source

 

 

 

WWN Filtering may or may not be needed depending upon the type of

 

 

 

network you are configuring. If Fibre Channel Switch Zoning is needed, do

 

 

 

this step before using UCM to configure the Edge. See the sections, “Required

 

 

 

Static Edge LUN Mapping” (page -5) and “Required Source WWN Filtering”

 

 

 

(page -7) to determine if these steps are needed.

 

 

 

 

 

 

 

 

There are three different examples shown in the “Network

 

 

 

Configuration Examples” section, to be used as references to

 

 

 

determine when Fibre Channel switch zoning, statically mapping the

 

 

 

LUNs, and source WWN filtering are required.

 

 

 

If your network requires static mapping or source WWN filtering,

 

 

 

perform all the steps shown in the above list including the optional

 

 

 

step “Static Mapping the LUNs and Filtering the Source WWN”.

 

 

 

Perform the “Delivering the Configured Network” step last.

 

 

 

 

 

 

 

 

NOTE: For help on the configuration process, click the Help button in UCM

 

 

 

on the active dialog box or press the F1 key.

 

 

 

 

 

 

 

 

 

 

 

Gathering the IP

 

Before starting the configuration procedure in ConfigManager you

 

Addresses

 

will need to gather the IP addresses for your network. The IP host

 

 

 

addresses and the completed UltraNet Edge Storage Router

 

 

 

Configuration IP Address Worksheet from Appendix J will be used in

 

 

 

the configuration process. The worksheet is referred to as the

 

 

 

Configuration IP address Worksheet throughout the remainder of this

 

 

 

chapter.

 

 

 

You will need the following addresses:

 

 

 

• UltraNet Edge 3000 Ethernet Maintenance Interface host IP

 

 

 

address

 

 

 

 

Configuring Tape Device Extension

 

 

 

 

9-9

 

 

 

 

 

9

Page 217
Image 217
McDATA 3000 manual Gathering the IP, Addresses, Configuration process. The worksheet is referred to as