
7
Configuring a 1x1 ATM Wide Area Network
| 21. Continue the configuration process by following the “Creating a |
| Data Path” section in this chapter. |
|
|
Creating a Data | After configuring the ATM circuit, you need to establish a |
Path | connection between the FC/IP interfaces by creating a data path. |
| This procedure will complete the configuration process. |
| Once you have configured the IP circuit, your screen should look |
| like the following example: |
1.In the main window of the map,
The Create Data Path menu is displayed.
McDATA UltraNet Edge 3000 User Guide | |
|
|