5
Configuring a 1x1 Ethernet Wide Area Network
Creating a Data | After configuring the IP circuit, you need to establish a connection |
Path | between the FC/IP interfaces by creating a data path. This procedure |
| will complete the configuration process. |
| Once you have configured the IP circuit, your screen should look like |
| the following example: |
1.In the main window of the UltraNet ConfigManager,
The Create Data Path menu is displayed.
2.Click the Create Data Paths selection. You should see “marching ants” outlining the FC/IP interface.
3.
NOTE: For a 2x2 configuration,
McDATA UltraNet Edge 3000 User Guide | |
|
|