2 Installing a Brocade
•A mechanical lift with a minimum 350 lb limit to move the router off the pallet. The ideal lift configuration is a counterweight base material lift with a metal lift plate installed in place of the forks. The metal plate should be no wider than 17 inches, so that it will fit between the rack mount rails.
•A strap to stabilize the router while you are moving it on the mechanical lift.
•A power drill with the following attachments:
-Large Phillips screwdriver
-Large
-
The Brocade
1.The router shipping crate must be in the upright position with enough space to slide the crate off of the pallet.
2.Use a power drill with Phillips and large
FIGURE 78 Removing bolts and screws and the front panel of the shipping crate
3.Remove the remaining bolts and screws that attach the bottom of the crate to the pallet.
4.Slide the sides, top, and back of the crate backwards as one unit until it clears the pallet.
5.Save the crate (including the shipping panel) in case the router needs to be shipped again.
110 | Brocade MLX Series and NetIron XMR Hardware Installation Guide |
|
|