3 Installing a Brocade
FIGURE 116 Crimping the power supply wire in the lug
1
1 #8 AWG power supply wire
4. Connect the
NOTE
DC return must be isolated from the router ground
5. Replace the transparent cover over the lugs.
Final steps
Complete these steps in the order listed:
•“Attaching a management station”
•“Activating the power source”
•“Verifying proper operation”
Installing a Brocade MLX-8 router
This section describes how to install a Brocade
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed in a perforated enclosure, the perforations must cover at least 60 percent of the surface.
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply. Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not intended for Outside Plant (OSP) installations.
Ensure that the proper cabling is installed at the site.
For information on cabling, refer to “Installing Brocade
164 | Brocade MLX Series and Brocade NetIron XMR Hardware Installation |