3 Installing a Brocade
Installing Brocade MLX-16 router modules
The Brocade
The installation sequence for multiple modules is important to ensure proper fit. Always fill the bottom slots in the Brocade
Follow this installation sequence:
1.Install a management module in management slot 2.
2.Install interface modules in interface slots 2, 4, 6, and 8.
3.Install switch fabric modules in switch fabric slots 2 and 4.
4.Install interface modules in interface slots 10, 12, 14, and 16.
5.Install a management module in management slot 1.
6.Install interface modules in interface slots 1, 3, 5, and 7.
7.Install switch fabric modules in switch fabric slots 1 and 3.
8.Install interface modules in interface slots 9. 11, 13, and 15.
NOTE
When installing a module in an empty device (with all slots covered by filler panels), first slightly loosen the screws on all of the filler panels. If you do not loosen all of the filler panel screws, the fit will be too tight when you install a module.
Installation instructions are identical for interface, management, and switch fabric modules. However, there are specific switch fabric and fan requirements for
For instructions about installing 100xGbE interface modules, refer to “Installing 2x100GbE interface modules in Brocade MLX routers” on page 151.
Modules for the Brocade
For information about how to disable and
DANGER
The