
Installing a Brocade NetIron XMR 32000 router | 4 |
FIGURE 201 Routing lower-left quadrant cables
1
2
3
4
1 | Lower left quadrant | 3 | Comb B (slot #21 and #22 cables) |
2 | Comb A (slot #19 and #20 cables) | 4 | Comb C (slot #23 and #24 cables) |
2.Route cables from slots #20 and #19 down through comb A. Refer to Figure 201.
3.Route cables from slots #22 and #21 down through comb B.
4.Route cables from slots #24 and #23 down through comb C.
Brocade MLX Series and Brocade NetIron XMR Hardware Installation Guide | 287 |
|
|