Installing a Brocade | 2 |
Installing a Brocade MLXe-4 router
This section describes how to install a Brocade
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed in a perforated enclosure, the perforations must cover at least 60 percent of the surface.
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply. Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not intended for Outside Plant (OSP) installations.
Ensure that the proper cabling is installed at the site.
For information on cabling, refer to “Installing power supplies in a Brocade
Unpacking a Brocade MLXe-4 router
The Brocade
•Router chassis with switch fabric modules installed in slots marked SF, slot blanks installed in all empty module slots, and mounting brackets attached for
•Insertion or extraction tool for use with RJ45 and
NOTE
If any items are missing, contact the place of purchase.
Follow these steps to unpack your Brocade
1.Remove the router from the shipping carton.
2.Save the shipping carton and packing materials in case you need to move or ship the router at a later time.
Installing a Brocade MLXe-4 router in a rack or cabinet
Your Brocade
•
•
•Mount the device in a