
3 Installing a Brocade MLX-32 router
1AWG power supply wire:
#8 AWG wire for 1200W power supply #6 AWG wire for 1800W power supply
4.Connect the
NOTE
DC return must be isolated from the router ground
5.Replace the transparent cover.
This equipment installation must meet NEC/CEC code requirements. Consult local authorities for regulations.
Final steps
Complete these steps in the order listed:
•“Attaching a management station”
•“Activating the power source”
•“Verifying proper operation”
Installing a Brocade MLX-32 router
The Brocade
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed within a perforated enclosure, the perforations must cover at least 60 percent of the surface.
You will need to use a mechanical lift to move and install the router. Be sure to allow enough working room for the lift.
NOTE
Make sure your site provides
Ensure that the proper power and network cabling is installed at the site.
For information on cabling, refer to “Brocade
Unpacking a Brocade MLX-32 router
The Brocade
190 | Brocade MLX Series and Brocade NetIron XMR Hardware Installation |