Functional Differences for G2 and G3 Call Vectoring and EAS

Table E-7. General Call Vectoring Functional Differences

TOPIC

GENERIC 3

GENERIC 2

 

 

An existing vector can not be

These capabilities are

 

 

copied to another blank vector.

provided by the switch

 

 

(This capability, however, is

administration.

 

 

available via CMS

 

 

 

administration.)

 

 

 

Either the VDN or the final

Variable format CDR (formerly

 

 

destination (but not both) is

SMDR) records can be used.

 

 

provided in the CDR record.

Consequently, both the VDN

 

 

 

and the final destination can

 

 

 

be provided. NOTE: CDR

 

 

 

records allow the VDN to be

 

 

 

specified in the calling party

 

 

 

field.

 

 

Blank steps are allowed in

Blank steps or blank vectors

 

 

vectors, and blank vectors (with

are not allowed (CMS also

 

 

no steps defined) may exist.

does not support this).

 

 

Trunk groups can be assigned to

Trunks groups can be

 

 

VDNs only via switch

assigned to VDNs via CMS

 

 

administration.

administration.

 

 

Vector processing is limited to a

Separate 1,000 step counters

 

 

maximum of 1,000 step

are provided for execution of

 

 

executions for a call. Once this

goto step commands and

 

 

maximum is reached,

check backup split retries. If

 

 

processing stops. There is an

either counter exceeds 1,000,

 

 

implied wait of one second for

the call is forced

 

 

every seven executed steps.

disconnected. Only check

 

 

 

backup split retries are

 

 

 

counted on internal calls.

 

 

 

 

 

Differences in Defining/Interpreting

Split Flows

Split flows are defined and/or interpreted according to the switch version and the management system involved. The following sections illustrate how split flow interpretation differs within the G1/G3 and G2 switch versions and according to two management systems, including R3 CMS and R2 CMS.

NOTE:

BCMS is not available on G2 (with or without vectoring).

E-10Issue 4 September 1995

Page 343
Image 343
AT&T 555-230-520 manual Differences in Defining/Interpreting Split Flows, Check backup split retries. If