Index

with disconnect, A-47with goto step, A-53with goto vector, A-59with messaging, A-61with queue-to,A-65with route-to,A-71with stop, A-76

with wait-time,A-80features of call vectoring, 1-5

adjunct routing command, 1-6advanced vector routing, 1-5ANI/ii-digits,1-5

basic call vectoring, 1-5call prompting, 1-5look-ahead interflow, 1-5

functions

of basic call vectoring, 4-2of call prompting, 5-5

G

G3

upgrading to expert agent selection, 10-38G3iV1.1

maximum system parameters, N-1G3V2

maximum system parameters, N-1G3V3

maximum system parameters, N-2observing VDNs, 3-11

G3V4

available enhancements, L-1comparison operators, 3-15enhancements

hardware and software requirements, B-4maximum system parameters, N-3

tone detector, 5-2goto command

differences between G2 and G3, E-4example, 4-18,4-19

neutral vector command, 8-8success/failure criteria, A-84troubleshooting, D-7

goto step command, 3-14,A-48neutral vector command, A-53

goto vector command, 3-14,A-54neutral vector command, A-59

H

handling multiple calls, 3-5

I

identifying caller needs

call prompting/VRU digits, 10-4direct agent calling, 10-5DNIS/ISDN called party, 10-4example prompts, 10-4

host database lookup, 10-5methods of, 10-2

table of services and DNIS digits, 10-4ii-digits

table of those currently available, 7-6values associated with them, 7-5

ii-digits routing, 7-5

uses for, 7-5improving

performance, 3-1,M-1expert agent selection, 10-1

service, 3-3,3-6

the average speed of answer, 2-17inserting vector steps, 2-5international

equivalent circuit packs, B-2,B-3

L

LAI

function, 8-1latest VDN, 3-9,3-10

leaving a message, 1-5,2-14,4-13listing existing vectors, 2-4

load balancing, 1-5optimal, 8-1providing, 2-17

logical agent, 1-4look-ahead interflow, 1-5,8-1

ADR, 8-13

alternate destination redirection, 8-13diagram of example, 8-13

considerations, C-3

diagram of tandem switch configuration, 8-10diagram of two switch configuration, 8-3DNIS and VDN override, 8-11

DNIS information, 8-12function, 8-1

hardware and software requirements, B-5requirements, 1-6

route-to command, 8-1tandem switch configuration

far end switch operation, 8-11sending switch operation, 8-10tandem switch operation, 8-10

troubleshooting, D-2two switch configuration

IN-6Issue 4 September 1995

Page 451
Image 451
AT&T 555-230-520 manual IN-6Issue 4 September