Index
IN-6 Issue 4 September 1995
with disconnect,A-47
with goto step,A-53
with goto vector,A-59
with messaging,A-61
with queue-to,A-65
with route-to,A-71
with stop,A-76
with wait-time,A-80
features of call vectoring,1-5
adjunct routing command,1-6
advanced vector routing,1-5
ANI/ii-digits,1-5
basic call vectoring,1-5
call prompting,1-5
look-ahead interflow,1-5
functions
of basic call vectoring,4-2
of call prompting,5-5
G
G3 upgrading to expert agent selection,10-38
G3iV1.1
maximum system parameters,N-1
G3V2
maximum system parameters,N-1
G3V3
maximum system parameters,N-2
observing VDNs,3-11
G3V4
available enhancements,L-1
comparison operators,3-15
enhancements
hardware and software requirements,B-4
maximum system parameters,N-3
tone detector,5-2
goto command
differences between G2 and G3,E-4
example,4-18, 4-19
neutral vector command,8-8
success/failure criteria,A-84
troubleshooting,D-7
goto step command,3-14, A-48
neutral vector command,A-53
goto vector command,3-14, A-54
neutral vector command,A-59
H
handling multiple calls,3-5
I
identifying caller needs
call prompting/VRU digits,10-4
direct agent calling,10-5
DNIS/ISDN called party,10-4
example prompts,10-4
host database lookup,10-5
methods of,10-2
table of services and DNIS digits,10-4
ii-digits
table of those currently available,7-6
values associated with them,7-5
ii-digits routing,7-5
uses for,7-5
improving
performance,3-1, M-1
expert agent selection,10-1
service,3-3, 3-6
the average speed of answer,2-17
inserting vector steps,2-5
international
equivalent circuit packs,B-2, B-3
L
LAIfunction,8-1
latest VDN,3-9, 3-10
leaving a message,1-5, 2-14, 4-13
listing existing vectors,2-4
load balancing,1-5
optimal,8-1
providing,2-17
logical agent,1-4
look-ahead interflow,1-5, 8-1
ADR,8-13
alternate destination redirection,8-13
diagram of example,8-13
considerations,C-3
diagram of tandem switch configuration,8-10
diagram of two switch configuration,8-3
DNIS and VDN override,8-11
DNIS information,8-12
function,8-1
hardware and software requirements,B-5
requirements,1-6
route-to c o m m an d,8-1
tandem switch configuration
far end switch operation,8-11
sending switch operation,8-10
tandem switch operation,8-10
troubleshooting,D-2
two switch configuration