NetWare Installation Checklists

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Task

With Access Logix

 

Reference Document

 

 

 

 

 

 

 

 

20 Server

View the output of the powermt display dev=x every=2 command, and

 

 

 

Test PowerPath

verify that

 

 

 

 

 

 

 

 

 

 

with a license key

• The state of the uncabled path(s) becomes “dead.”

 

 

 

 

(cont.)

• I/O continues to the remaining path(s) to the LUN, indicating that the

 

 

 

 

 

 

 

 

 

 

path failover was successful, and PowerPath is working properly.

 

 

 

 

 

Reconnect the cable that you disconnected from the HBA.

 

 

 

 

 

If you did not follow the above steps exactly and caused any LUNs to

 

PowerPath product

 

 

 

trespass, restore the LUNs to their original SP with the following

 

guide

 

 

 

PowerPath command:

 

 

 

 

 

powermt restore

 

 

 

 

 

 

 

 

 

 

 

You are now ready to set up any optional software, such as SnapView

 

 

or MirrorView, on the storage system.

 

 

 

PowerPath Checklist — Existing NetWare Server and New Storage System

4-27

Page 185
Image 185
EMC 69001166 manual Or MirrorView, on the storage system