AIX Installation Checklists

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Task

 

With Access Logix

Reference Document

 

 

 

 

 

 

 

 

 

6

Server

Insert the PowerPath installation CD and mount it.

PowerPath Release

 

 

 

Install

Install PowerPath using SMIT or from the command line.

Notes and PowerPath

 

 

 

for UNIX installation and

 

 

 

PowerPath

 

 

 

 

 

 

administrator’s guide

 

 

 

 

 

 

 

 

 

 

 

Register PowerPath.

 

 

 

 

 

Install any PowerPath patches from the Software downloads page on the

 

 

 

 

 

 

EMC Powerlink website:

 

 

 

 

 

 

http://powerlink.emc.com

 

 

 

 

 

 

 

 

 

 

7

Switches

For a SAN

Rails, cabinet, and

 

 

 

Install

Install switches, if not already installed.

switch documentation

 

 

 

 

 

 

 

 

Connect a cable from each host HBA port to a switch port.

 

 

 

 

 

On the server:

AIX documentation

 

 

 

 

 

• Download emc_cfgmgr.sh from ftp://ftp.emc.com/pub/elab/

 

 

 

 

 

 

powerpath/aix.

 

 

 

 

 

 

• Execute the following commands

 

 

 

 

 

 

cfgmgr

 

 

 

 

 

Checkpoint - Verify the HBA connection to the switch by checking the

Switch documentation

 

 

 

 

 

LED(s) for the switch port connected to the HBA port.

 

 

 

 

 

 

For a 1-Gbit switch - LED is green, which indicates that the HBA is logged

 

 

 

 

 

 

in to the switch port.

 

 

 

 

 

 

For a 2-Gbit switch - One of the following:

 

 

 

 

 

 

• The left LED is green and the right LED is off, which indicates that a

 

 

 

 

 

 

1-Gbit SP port is logged in to the switch port.

 

 

 

 

 

 

• For a DS-xxB2 switch, both LEDs are green, which indicates that a

 

 

 

 

 

 

2-Gbit HBA port is logged in to the switch port.

 

 

 

 

 

 

• For a DS-xxM2 switch, the left LED is blue and the right LED is off, which

 

 

 

 

 

 

indicates that a 2-Gbit HBA port is logged in to the switch port.

 

 

 

 

 

 

 

 

 

 

8

Storage System

Install the storage system in the cabinet, if not already installed.

Rails and cabinet

 

 

 

Install

 

 

 

documentation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PowerPath Checklist — New AIX Server and New Storage System

1-7

Page 17
Image 17
EMC 69001166 manual Install, PowerPath, Switches For a SAN, Cfgmgr