PowerPath Checklist New Solaris Server and Existing Storage System

Tasks highlighted with grey in the checklist should be completed before the service provider arrives.

The Without Access Logix column does not apply to CX300, CX500, and

CX700 storage systems because they ship from the factory with the Access

Logix enabler installed.

Task

 

With Access Logix

Without Access Logix

Reference Document

 

 

 

 

 

 

 

1

Server

Install HBAs.

Install HBAs.

HBA documentation

 

Install HBAs and

 

CAUTION Do not connect cables

 

CAUTION Do not connect cables

(see URL on page 5-4).

 

driver

 

to the HBAs until you are told to

 

to the HBAs until you are told to

 

 

 

 

do so later in this procedure.

 

do so later in this procedure.

 

 

 

Install HBA driver.

Install HBA driver.

 

 

 

 

 

 

2

Server

Set the HBA driver parameters,

Set the HBA driver parameters,

Solaris host

 

Set HBA driver

 

except for the persistent bindings,

 

except for the persistent bindings,

connectivity guide

 

 

to the values required for

 

to the values required for

 

 

parameters

 

 

For Emulex or QLogic

 

 

CLARiiON and PowerPath.

 

CLARiiON and Power Path.

 

 

 

 

HBAs - HBA

 

 

 

 

 

 

 

 

 

You will set the persistent

 

You will set the persistent

documentation (see

 

 

 

bindings after the storage system

 

bindings after the storage system

URL on page 5-4)

 

 

 

is installed and the switches are

 

is installed and the switches are

For JNI HBAs - Solaris

 

 

 

zoned.

 

zoned.

 

 

 

 

utilities administrator

 

 

 

 

 

 

 

 

 

For an Emulex HBA driver, be

 

For an Emulex HBA driver, be

guide

 

 

 

sure to set the following

 

sure to set the following

 

 

 

 

parameter:

 

parameter:

 

 

 

 

no-device-delay=0

 

no-device-delay=0

 

 

 

 

CAUTION Using improper

 

CAUTION Using improper

 

 

 

 

settings can cause erratic failover

 

settings can cause erratic failover

 

 

 

 

behavior, such as greatly

 

behavior, such as greatly

 

 

 

 

increased I/O delays.

 

increased I/O delays.

 

 

 

 

 

 

 

 

5-14

EMC Installation Roadmap for CX-Series and FC-Series Storage Systems

Page 210
Image 210
EMC 69001166 manual To the values required for, CLARiiON and PowerPath CLARiiON and Power Path, HBAs HBA