Page 654 of 910 IP Line administration using OTM 2.2
553-3001-365 Standard 4.00 August 2005
19 Choose a card slot for the new card. Note the TN. Configure IPTN in
Meridian 1. See Table 65 on page 342.
20 Install the I/O cables for the connection to the ELAN and TLAN subnets
on the selected card slot.
Ensure that the I/O cables are connected to the ELAN and TLAN subnets.
21 In the OTM Navigator window, click the Services folder. Double-click the
ITG Line 4.5 icon.
The IP Telephony Gateway - IP Line 4.5 window opens.
22 From this list of IP Telephony nodes in the upper part of the window,
select the IP Telephony node to which the configuration data will be
transmitted.
23 Click the Configuration > Synchronize > Transmit.
The Transmit Options window opens.
24 Keep the default setting of Transmit to selected nodes radio button.
Check only the Node Properties to Active Leader check box.
See Figure 222 on page 655.