1152700 • Issue 1 • February 2001 • Section 2 Operation and Maintenance
DLP-712
Page 3 of 8
limited only by the number of ports in the RNE and the 50 node limit per network. Repeat this procedure for each
Stop! You have completed this procedure.
Cellworx Vision Subnetwork Management System
File
Configuration
Fault Performance
Time and Date |
Connection |
Topology |
Software
NMIC Platform
Add Ring Network Element
Add Expansion Shelf Network Element
Remove Ring Network Element
Remove Expansion Shelf Network Element
Refresh...
Force Network Discovery ...
Revert to Saved Icon Layout...
Ring Audit
Ring Upgrade
Turn Up Ring...
Figure 712-1. Cellworx Vision Add an Expansion Node Pull Down Menu
Cellworx Vision: Add EPS NE - Task Overview | X | |
1) | Enter network element identifiers |
|
2) | Enter slot and port numbers |
|
3) | Verify RNE interface is a SEPI |
|
4) | Physically connect EPS to ring NE |
|
5)Wait for EPS node to boot
6)Verify NE shelf type
7)Validating EPS card type
8)Wait for database update
9)Configure software load
10)Verifying EPS interface is a SEPI
11)Configure ATM mapping to PLCP
12) EPS Added updating topology
Figure 712-2. Cellworx Vision Adding an STN-EPS Task Overview Window