![](/images/new-backgrounds/1206162/206162413x1.webp)
1152700 • Issue 1 • February 2001 • Section 2 Operation and Maintenance
DLP-737
Page 4 of 8
Cellworx Vision: Add Ring NE - Task Overview | X | |
1) | Select physical location for new node |
|
2) | Enter new network element identifiers |
|
3) | Physically remove transmit fiber from left RIC |
|
4) | Physically remove receive fiber from left RIC |
|
5)Connect new network element to left RICs
6)Wait for new network element to boot
7)Verifying NE shelf type
8)Select software images
9)Verifying NE connectivity over slot 16
10)Backing up NMIC database
11)Initiating 1st pass discovery
12)Physically remove transmit fiber from right RIC
13)Physically remove receive fiber from right RIC
14)Connect new network element to right RICs
15)Initiating 2nd pass discovery
16)Verifying physical connectivity
17)NE added
Figure 737-2. Cellworx Vision Add Ring NE Task Overview
Cellworx Vision: Add Ring NE- Select Location
X |
Please select the two network elements between which the new network element will be connected in the ring.
Network element 1 / Network Element 3 Network element 3 / Network Element 2 Network element 2 / Network Element 1
Current status: Waiting for all NEs to boot . . .
Cancel
Next>>
Figure 737-3. Cellworx Vision Add Ring NE Select Location Window
Page
2000, ADC Telecommunications, Inc.