1 GENERAL
This section provides operation and maintenance procedures for the Cellworx Service Transport Node (STN) for the system administrator/operator.
Operation and maintenance includes but is not limited to the following tasks:
•Performing end to end signal tests to verify system operation.
•Adding modules to an
•Configuring the modules for operation (S/W configuration and download).
•Configuring the VP/VC traffic connections for operation.
•Troubleshooting alarm conditions.
•Using the GUI interface to check network and node statuses.
•Performing card/traffic level switching for maintenance, troubleshooting, or testing purposes.
2 USING A TOP DOCUMENT
The procedures in this section are written in the Task Oriented Process (TOP) format. The TOP method of presenting information provides step by step instructions for the successful completion of the indicated task. To find the instructions for performing enclosure installation, module installation and initial turn up, and installation troubleshooting tasks, refer to Figure
1.Find the task to be performed in the Indexed Task List
2.Locate the specified director level, detail level, or trouble clearing procedure. All procedures are in numerical order, regardless of type. The TOP procedures in this manual are of the following four types:
a)
b)Trouble Analysis Procedure (TAP) − A director level procedure that provides step by step instructions to locate and fix problems.
c)Detailed Level Procedure (DLP) − Detailed step by step instructions or procedures.