1152700 Issue 1 February 2001 Section 2 Operation and Maintenance

DLP-737

Page 6 of 8

Cellworx Vision : Add Ring NE - Connect Fiber X

Connect the physical fiber to the transmit port of the left Ring Interface Card on network element

West Node (id 1)

and the receive port of the left Ring Interface Card on the new network element.

Connect the physical fiber to the receive port of the left Ring Interface Card on network element

East Node (id 2)

and the transmit port of the left Ring Interface Card on the new network element.

CancelNext>>

11725-BC

Figure 737-7. Cellworx Vision Add Ring NE Connect New NE Fibers

Cellworx Vision : Add Ring NE - Wait for Boot-up

 

 

X

 

 

 

 

 

 

 

Waiting for new network element to boot...

Normal boot time should not exceed five minutes

Elapsed time: 9

Cancel

11759-C

Figure 737-8. Cellworx Vision Wait For NE to Boot

Cellworx Vision: Add NE - Boot Time Exceeded

X

Normal boot time for the network element has been exceeded. This could be the result of a communication failure with the network element. Please check all cables and the network element's status via craft interface if necessary.

Retry

Quit

0026-046

Figure 737-9. Add NE Boot Time Exceeded Window

Page 2-189

2000, ADC Telecommunications, Inc.

Page 209
Image 209
ADC Release 3.1 user manual Cellworx Vision Add NE Boot Time Exceeded