1152700 • Issue 1 • February 2001 • Section 2 Operation and Maintenance
DLP-737
Page 6 of 8
Cellworx Vision : Add Ring NE - Connect Fiber X
Connect the physical fiber to the transmit port of the left Ring Interface Card on network element
West Node (id 1)
and the receive port of the left Ring Interface Card on the new network element.
Connect the physical fiber to the receive port of the left Ring Interface Card on network element
East Node (id 2)
and the transmit port of the left Ring Interface Card on the new network element.
CancelNext>>
Figure 737-7. Cellworx Vision Add Ring NE Connect New NE Fibers
Cellworx Vision : Add Ring NE - Wait for |
|
| X |
|
|
| |
|
|
|
|
Waiting for new network element to boot...
Normal boot time should not exceed five minutes
Elapsed time: 9
Cancel
Figure 737-8. Cellworx Vision Wait For NE to Boot
Cellworx Vision: Add NE - Boot Time Exceeded
X |
Normal boot time for the network element has been exceeded. This could be the result of a communication failure with the network element. Please check all cables and the network element's status via craft interface if necessary.
Retry
Quit
Figure 737-9. Add NE Boot Time Exceeded Window
Page
2000, ADC Telecommunications, Inc.