Page 1 of 1
CONDUCT ACCEPTANCE TESTS ON A CELLWORX STN NODE
Summary: This procedure lists the test that can be performed on a newly installed Cellworx STN node whether installed as a ring node or terminal node.
SONET Diagnostics  | |
Initiate a Protection Switch  | |
Perform Loopback Tests  | |
Initiate a Card Reset  | |
Execute an Alarm Cut Off (ACO)  | 
Page 
© 2000, ADC Telecommunications, Inc.