1152700 Issue 1 February 2001 Section 2 Operation and Maintenance

DLP-723

Page 2 of 5

TESTING CONNECTIONS

5.To enable Network Data Collection (NDC) on the connection for either ingress or egress, click anywhere on the box or text next to it that reads Ingress NDC or Egress NDC.

6.To test the connection selected and displayed on the Subnetwork Connection Configuration window, click on the box next to Test Type which should currently read “No Test” if no test has been previously initiated on it. The selection window appears displaying the following options:

No Test – No test is in progress or requested.

End-End OAM Loopback –

Segment End Loopback –

Continuity Check Source –

Continuity Check Sink

7.At the Loopback Location ID field, enter a unique ID identifying the location that the loopback cells are being generated from.

8.At the Insert Loopback Cells field, either leave the selection on Towards Access Facility which will loop the incoming cells back out to the AIC cards in the system, or click on the textbox and drag downwards to select Towards Ring Facility to loop the cells incoming from the RIC cards back out to the Ring.

9.The Test Status display indicates whether the connection is currently under test. Clicking on the Test Status button below it will refresh the status display and the Abort Test button will abort the test.

Cellworx Vision Subnetwork Management System

File Configuration Fault Performance

Time and Date

 

Connection

Create...

 

Topology

View ...

Software

Configure Traffic Contract ...

Configure Service Provider Profile ...

NMIC Platform

View Ring Resource Usage ...

 

 

View Fiber Bandwidth Usage ...

 

10963-D

Figure 723-1. View Connection Pull Down Menu

Page 2-134

2000, ADC Telecommunications, Inc.

Page 154
Image 154
ADC Release 3.1 user manual Testing Connections, View Connection Pull Down Menu