Brocade Communications Systems IP250 user manual 522 53-1003056-01

Models: IP250

1 1753
Download 1753 pages 4.1 Kb
Page 574
Image 574

16 Switch, port, and LAG deployment

4.Click one of the following deployment options:

Deploy now

Save and deploy now

Save deployment only

Schedule

5.Click one of the following save configuration options:

Save to running

Save to running and startup

Save to running and startup then reboot

The name for the scheduled product deployment is pre-populated with a “DCB-MM-DD-YYYY-HR-MIN-SS” prefix. This is an editable field.

6.Provide a description for the product/port/LAG deployment.

7.If the Schedule option is selected, click the Use check box for one-time deployment. One-time deployment is the only option.

The name of the origin product is a read-only field. The origin product receives the entire configuration, unless it is removed from the Selected Targets list.

8.Select one or more of the following configurations, to be deployed on the selected targets.

NOTE

These configurations can be pushed to target DCB switches, FOS version 6.3.1_cee or 6.3.1_del.

For switches:

QoS, DCB Map

QoS, Traffic Class Map

FCoE Map

VLAN Classifiers and Rules

LLDP Profiles

802.1x Configuration

NOTE

See “Source to target switch Fabric OS version compatibility for deployment” for restrictions.

For ports:

Port attributes (interface mode, etc.)

QoS, DCB Map / Traffic Class Map

FCoE Map

LLDP Profiles

802.1x Configuration

522

Brocade Network Advisor IP User Manual

 

53-1003056-01

Page 574
Image 574
Brocade Communications Systems IP250 user manual 522 53-1003056-01