24 Creating a payload configuration

9.(Optional) Enter the following information if you want the Management application to run and save a report before or after this configuration is deployed to the device.

a.Select the Pre-Deploymentcheck box if you want the Management application to run and save a report before this configuration is deployed.

b.Select the Post-Deploymentcheck box if you want the Management application to run and save a report after this configuration is deployed.

c.From the CLI Template list, select the template that contains the show commands that are executed before or after this configuration is deployed to the target.

d.If you selected the Post-Deploymentcheck box, and you want the Management application to wait a few seconds after this deployment before proceeding to the post-deployment, indicate the delay on the Post-Deployment Delay slider.

10.Select whether you want to save this configuration.

Select One-time deployment, do not save configuration if you want to deploy the configuration, but not save it.

Select Save configuration if you want the Management application to save the configuration.

If you select this option, enter a name for the configuration and an optional description in the Name and Description fields.

11.Click Next.

If you selected Save configuration, the Deployment Schedule pane displays, as shown in Figure 299. Continue with step 12.

FIGURE 299 Configuration dialog box - Deployment Schedule pane

772

Brocade Network Advisor IP User Manual

 

53-1003056-01

Page 824
Image 824
Brocade Communications Systems IP250 user manual Configuration dialog box Deployment Schedule pane