Connect a GOT to each PLC CPU to respond to the system switching.
|
|
|
|
|
|
|
|
|
| CPU direct connection |
|
|
| |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| GOT1 |
|
|
|
|
|
|
| |||
| Monitor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
| Network No. 1, Station No. 0 |
|
|
| ||||||||||||||||
| target |
|
|
|
| (Multiplexed remote master station) |
|
| ||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
| supplyPower module |
| Q25PRHCPU |
|
| QJ71BR11 |
|
|
| QJ61BT11N |
| Empty |
| supplyPower module | Q25PRHCPU | ||||||||
Control system | ||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
(System A) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CPU direct connection
GOT2
Network No. 1, Station No. 1 (Multiplexed remote sub master station)
QJ71BR11 | QJ61BT11N | Empty | Standby system | ||
|
|
|
|
| |
|
|
|
|
| (System B) |
|
|
|
|
|
|
MELSECNET/H remote I/O network
Network No. 1, Station No. 2 (remote I/O station)
|
|
|
|
|
|
|
supply Power module |
| QJ71C24N | Empty | Empty | ||
|
|
|
|
|
|
|
(1)Connection method
Connect GOTs to the
For details, refer to the following.
(2)GT Designer3 setting
Set GT Designer3 as follows.
Setting item | Settings | Model | |
|
|
| |
Controller Type |
|
|
|
|
|
| |
Device setting | Host | Host |
|
(Network setting) |
| ||
|
|
| |
Q Redundant Setting |
| Do not set the item. |
|
(3)Monitoring target change when system switching occurs in a redundant system
When the system switching occurs, the GOT cannot change the monitor target automatically in response to the system switching.
The GOT that is connected to the control system CPU module after system switching continues the monitoring. Different from the case using one GOT, no cable reconnection is required.
POINT
To automatically change the monitoring target after system switching using one GOT, make the Q redundant settings.
4 - 12 | 4. HOW TO MONITOR REDUNTANT SYSTEM |
| 4.2 Direct CPU Connection |