
20.5 Precautions | 17 |
GOT's communication timing
(1) GOT's communication timing |
Adjust the communication timing so that, after applying |
the power to the system, the communication with the |
connected device (MITSUBISHI PLC) is performed in |
order starting from the first GOT (from the 1st GOT to |
the 2nd, and so on). |
When the communication is failed, retries are |
performed. And if the predetermined time has elapsed, |
a communication error occurs. |
• If the first GOT is turned on after a while the second |
Using the FA transparent function
When multiple GOTs are connected, the FA transparent function is not available even if the
(When connecting a personal computer to the first GOT, the FA transparent function can be used.)
1st GOT | PC |
2nd GOT |
ROBOT CONTROLLER CONNECTION
18
CNC CONNECTION
GOT is turned on, because the communication start of |
the second GOT is delayed, a communication error |
may be detected at the second GOT. |
• If the system power is turned on simultaneously and it |
takes time to start the communication of the second |
GOT, a communication error may be developed. |
(2) Adjusting communication timing |
USB
1st GOT
PC
PC
19
GOT
(a) When powering up the system simultaneously |
Using the utility or selecting [GOT Setup] - |
[Opening Screen Time] from GT Designer3, set the |
opening screen time adding a delay to each setting |
for the GOTs. |
During the opening process, communication with |
the connected device does not start. |
Example: Set value of [Opening Screen Time]
(Inside (): set value)
First module (5s) Second module (10s)
(b)When powering on devices individually
Turn on the connected device first, and then the first GOT, the second GOT, and so on.
Power supply (24V DC) |
| The title screen | ||
Power feeding to GOT |
|
| is displayed. |
|
Communication of the
First GOT's2nd GOT is enabled. user screen communication
Second GOT's |
|
|
communication | Retry | user screen |
|
Monitoring stop condition for the GOT in the
In the system where multiple GOTs are connected, performing either of the following monitoring stop operations on the preceding stage (the first GOT) also stops monitoring of the GOT on the next stage (the second GOT).
When the GOT on the preceding stage resumes monitoring, the GOT on the next stage also resumes it.
•When project data or the OS is written/read by GT Designer3*1
•When the GOT is set up*1
*1 A timeout error occurs in GX Developer.
1st GOT | 2nd GOT GT Designer3 | |
Downloading | Monitoring | |
stopped | ||
|
USB
The project data is being download.
When PLC power disconnection occurs in the
In the system where multiple GOTs are connected, when the communication between the PLC and the first GOT is stopped due to PLC power disconnection and a disconnection of the communication cable between the PLC and the first GOT, the GOT waits for timeout against the communication request from the peripheral devices (GX Developer, etc.), and recovery of monitoring between the PLC and the GOT is delayed.
1st GOT | 2nd GOT |
Monitoring | Monitoring |
20
21
FUNCTION
22
FUNCTION
FA TRANSPARENT
20. | 20 - 11 |
20.5 Precautions |
|