When two GOTs are connected
Main base unit | Extension base | Bus extension | 1st GOT | 2nd GOT |
|
| |||
unit |
| connector box |
|
| |||||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
| Communication driver | |
|
|
|
|
|
|
|
| Bus(A/QnA) | |
| Extension cable | Connection cable 1) | Connection cable 2) | Connection cable 3) |
|
| |||
|
|
|
| PLC*5 |
|
|
| GOT (1st)*4 |
|
Main base | Extension | Extension | Connection cable 1) | Bus connector | Connection cable 2) | Option device*7*8 | Model | ||
| |||||||||
cable*1 |
| base*2 | conversion box |
| |||||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
| ||
|
|
|
|
| - | - |
| ||
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
Main base | - | - |
|
| ||
|
|
| - | - | ||
|
|
| ||||
|
|
|
|
| *5 | |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| ||||
|
|
| ||||
|
|
| ||||
|
|
|
| *5 | ||
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
| - | - | ||
|
|
| ||||
|
|
|
|
| ||
|
|
|
|
|
| |
| Extension | Extension |
|
|
|
|
Main base |
|
|
| |||
cable | base |
|
| |||
| - | - | ||||
|
|
| ||||
|
|
|
|
| *5 | |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| ||||
|
|
| ||||
|
|
| ||||
|
|
|
| *5 | ||
|
|
|
|
|
*1 For the extension cables, refer to
*2 Use the A168B for the extension base unit.
*3 When installing the 1st GOT 30m or more away from the main base unit, the bus connector conversion box is required. *4 When connecting to multiple GOTs with GT 16, GT15 and GT11 mixed, use GT11 as a terminal.
*5 When using
*6 The number of connectable GOTs is restricted according to the CPU type and the number of intelligent function modules. 5.4.12 When connecting multiple GOTs
5 - 26 | 5. BUS CONNECTION |
| 5.2 System Configuration |