(2) Operational settings
(3) Open settings
Item | Setting | Setting | |
(with GOT connected) | |||
|
| ||
Protocol | TCP |
| |
|
|
| |
Open system | MELSOFT connection |
|
Fixed buffer
Fixed buffer communication procedure
1
PREPARATORYFORPROCEDURESMONITORING 2
RANGESETBE
DEVICE CANTHAT 3
RANGEMONITORING
Item | Setting | Setting | |
(with GOT connected) | |||
|
| ||
|
|
| |
Communication | (Use default value.) |
| |
date code*1 |
| ||
|
| ||
IP address | 192.168.0.19 |
|
Pairing open
Existence confirmation
Host station Port No. (DEC.)
(Use default value.)
ACCESS FOR 4
Initial timing*1 |
|
Send frame setting | (Use default value.) |
| |
TCP Existence |
|
confirmation setting |
|
| :Required :Set if necessary :Not required |
*1 Because the port No. 5551 is fixed, the GOT operates as follows, regardless of the setting for the item.
•Communication date code : [Binary code]
•Initial timing : [Always wait for OPEN]
(Communications are enabled while the programmable controller CPU stops.)
*2 The default value of IP address is 192.168.1.254. Set the IP address corresponding to the system configuration.
POINT
When changing Ethernet parameter
After writing the Ethernet parameter to the programmable controller CPU, turn off and then on, or reset the programmable controller CPU.
Transmission target device
IP address
Transmission target device
Port No. (DEC.)
:Required :Set if necessary :Not required
POINT
When connecting to multiple GOTs and peripheral devices
The number of protocols equivalent to that of the GOTs and devices must be set.
MONITORTOREDUNTANTSYSTEM HOW 5
CONNECTIONBUS 6
DIRECTTOCONNECTIONCPU 7
LINKCOMPUTER CONNECTION 8
ETHERNETCONNECTION
8. ETHERNET CONNECTION | 8 - 39 |
8.4 PLC Side Setting |
|