When two GOTs are connected
Main base unit | Extension base | Bus extension | 1st GOT | 2nd GOT | |
unit | connector box | ||||
|
|
|
Communication driver
Bus(A/QnA)
| Extension cable |
| Connection cable 1) |
|
| Connection cable 2) |
|
|
| Connection cable 3) |
|
|
|
| ||
|
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PLC*4 |
|
|
|
|
|
|
|
|
|
| GOT (1st)*2 |
|
|
Main |
|
| Extension |
|
|
|
| Bus connector |
| Connection cable 2) |
|
| ||||
Extension cable |
| Connection cable 1) |
|
|
| Option device*5*6 | Model | |||||||||
base |
| base | conversion box |
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
- | - | |||
|
|
Main | - | - | |
base | |||
|
|
| *3 | |||
|
|
|
|
| |||
- | - | |||
|
| |||
|
|
|
Main | Extension | |
base | base |
|
|
|
| ||
|
| ||||
|
| ||||
|
| ||||
|
|
| *3 | ||
|
|
|
| ||
|
|
|
|
| |
|
|
| |||
*1 | When installing the 1st GOT 30m or more away from the main base unit, the bus connector conversion box is required. | ||||
*2 | When connecting to multiple GOTs with GT 16, GT15 and GT11 mixed, use GT11 as a terminal. |
| |||
*3 | When using |
| |||
|
|
|
| ||
|
|
|
| ||
*4 | The number of connectable GOTs is restricted according to the CPU type and the number of intelligent function modules. |
5 - 20 | 5. BUS CONNECTION |
| 5.2 System Configuration |