
11.5 Precautions
GOT startup in
For the
When a network error occurs in the system alarm
In the
To cancel the system alarm display, restart the GOT.
Connection in the multiple CPU system
When the GOT is connected to multiple CPU system, the following time is taken until when the PLC runs.
QCPU (Q mode), motion controller CPU (Q series): 10 seconds or more
MELDAS C70: 18 seconds or more
When the GOT starts before the PLC runs, a system alarm occurs. Adjust the opening screen time in the GOT setup so that no system alarm occurs.
GT Designer3 Version Screen Design Manual
For version restrictions of the
Connection to QSCPU
The GOT can only read device data and sequence programs by the ladder monitor function in the QSCPU.
The GOT cannot write any data to the QSCPU.
Connection to Q170MCPU
Set [CPU No.] to "2" in the device setting to monitor the device of the Motion CPU area (CPU No.2).
When the CPU No. is set to "0" or "1", the device on the PLC CPU area (CPU No.1) is monitored.
When the CPU No. is set to the number other than "0" to "2", a communication error occurs and the monitoring cannot be executed.
For setting the CPU No., refer to the following manual.
GT Designer3 Version Screen Design Manual
Example) Setting dialog box of the bit device
11 - 16 | 11. |
| 11.5 Precautions |