Checking if the GOT is performed the data link correctly

(1)For MELSECNET/H, MELSECNET/10 network system

Check if the GOT is performed the data link correctly in [Other station information]. For the GX Developer operation method, refer to the following manual.

Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)

(a)Check [Communication status of each station] and [Data-Link status of each station] (The display example on GX Developer Version 8)

Startup procedure

GX Developer [Diagnostics] [MELSECNET (II)/10/H diagnostics] Other station info.

1 - 52

1. PREPARATORY PROCEDURES FOR MONITORING

 

1.6 Checking for Normal Monitoring