
Checking if the GOT is performed the data link correctly
(1)For MELSECNET/H, MELSECNET/10 network system
Check if the GOT is performed the data link correctly in [Other station information]. For the GX Developer operation method, refer to the following manual.
Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)
(a)Check [Communication status of each station] and
Startup procedure
GX Developer [Diagnostics]
[MELSECNET (II)/10/H diagnostics]
Other station info.
1 - 52 | 1. PREPARATORY PROCEDURES FOR MONITORING |
| 1.6 Checking for Normal Monitoring |