(1)Precautions for reapplying the power to the GOT (OFF to ON)
Do not
Before doing so, be sure to turn off the PLC first.
HINT
Operations causing automatic reboot of the GOT1000 Series
Since the GOT1000 Series is automatically rebooted in the following cases, the power does not need to be reapplied to the GOT (OFF to ON).
•When an OS is written from GT Designer3 or a CF card
•When utility settings have been changed
(2)When turning OFF the GOT before display of the user creation screen
When the GOT is turned OFF before the user creation screen is displayed on the GOT, subsequent communications may be no longer possible.
In such a case, reapply the power to the PLC CPU and GOT.
(3)Precautions for connection of 3 GOTs or more (when connecting QCPU (Q mode))
5.4.10 (1)Restrictions in overall cable length to No. of GOTs
5.4.4Reset switch on GOTWhen bus connection is used, the reset switch on the GOT does not function.
(1)When turning OFF or resetting the PLC during monitoring
When turning OFF or resetting the PLC during monitoring, the system alarm (No.402: timeout error) is generated.
When the PLC CPU is restored, the GOT automatically resumes monitoring.
Use System Information to reset the alarm.
For the System Information, refer to the following manual:
GT Designer3 Version Screen Design
Manual
(2)When turning OFF or resetting the PLC CPU before display of the user creation screen
When the PLC CPU is turned OFF or reset before the user creation screen is displayed on the GOT, subsequent communications may be no longer possible.
In such a case, reapply the power to the PLC CPU and GOT.
(3)Precautions for connection of 3 GOTs or more (when connecting QCPU (Q mode))
5.4.10 (1)Restrictions in overall cable length to No. of GOTs
5.4.6Position of the GOTAlways connect the GOT to the last base unit. Connecting a GOT between base units is not allowed.
5.4.7When the GOT is bus- connected to a PLC CPU without the communication driver written
When the GOT is
In this case, disconnecting the bus connection cable from the GOT will cancel the reset status of the PLC CPU.
1
PREPARATORYFORPROCEDURESMONITORING 2
RANGESETBE
DEVICE CANTHAT 3
RANGEACCESS MONITORINGFOR 4
MONITORTOREDUNTANTSYSTEM HOW 5
CONNECTIONBUS 6
DIRECTTOCONNECTIONCPU 7
LINKCOMPUTER CONNECTION 8
ETHERNETCONNECTION
5. BUS CONNECTION | 5 - 35 |
5.4 Precautions |
|