4.8.4
This section explains the
The following shows an example of connecting the GOT to the
Monitor target
Control system (System A)
supplyPower module | Q25PRHCPU | QJ71BR11 | Empty | Empty |
| supplyPower module | Q25PRHCPU | QJ71BR11 | Empty | Empty | Standby system |
| (System B) | ||||||||||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
Network No. 0, Station No. 0 (Master station)
supply Power module | QJ61BT11N | Empty | Empty | Empty |
Redundant type extension base unit
Network No. 0, Station No. 1
GOT
(1)Connection method
Connect the
14.
(2)GT Designer3 setting
Set GT Designer3 as follows.
Setting item | Settings | Model | |
|
|
| |
Controller Type |
|
|
|
|
|
| |
Device setting | Master station | Other (NW No.0, Station No.0 or FF (master station)) |
|
(Network setting) |
| ||
|
|
| |
Q Redundant Setting |
| Do not set the item. |
|
(3)Monitoring target change when system switching occurs in a redundant system
When the system switching occurs, the GOT automatically changes the monitoring target to the PLC CPU switched to the control system.
4 - 28 | 4. HOW TO MONITOR REDUNTANT SYSTEM |
| 4.8 Connection to the Redundant Type Extension Base Unit |