
14.6 Precautions
Connection in the multiple CPU system | Connection to Q170MCPU |
9
(PLC NETWORK)
When the GOT is connected to multiple CPU system, the following time is taken until when the PLC runs.
QCPU (Q mode), motion controller CPU (Q series): 10 seconds or more
MELDAS C70: 18 seconds or more
When the GOT starts before the PLC runs, a system alarm occurs.Adjust the opening screen time in the GOT setup so that no system alarm occurs.
GT Designer3 Version Screen Design Manual
Connection to LCPU
LCPU may diagnose (check file system, execute recovering process, etc.) the SD memory card when turning on the power or when resetting. Therefore, it takes time until the SD memory card becomes available. When the GOT starts before the SD card becomes available, a system alarm occurs. Adjust the opening screen time in the GOT setup so that no system alarm occurs.
GT Designer3 Version Screen Design Manual
Connection to Q17nDCPU, Q170MCPU, CNC C70,
The Q17nDCPU, Q170MCPU, CNC C70 and CRnQ- 700 are applicable to the
For connecting to the
Set [CPU No.] to "2" in the device setting to monitor the device of the Motion CPU area (CPU No.2).
When the CPU No. is set to "0" or "1", the device on the PLC CPU area (CPU No.1) is monitored.
When the CPU No. is set to the number other than "0" to "2", a communication error occurs and the monitoring cannot be executed.
For setting the CPU No., refer to the following manual.
GT Designer3 Version Screen Design Manual
Example) Setting dialog box of the bit device
MELSECNET/H CONNECTION TO PLC
10
MELSECNET/10 CONNECTION (PLC TO PLC NETWORK)
11
12
13
14
15
CONNECTION
INVERTER
16
CONNECTION
SERVO AMPLIFIER
14. | 14 - 17 |
14.6 Precautions |
|